District Asset Management Plan

Management of the complex infrastructure for the District requires a plan for routine utility maintenance. EAWSD developed a District Asset Management Plan in 2016, which describes the District’s maintenance programs. Some elements of the District’s current preventative maintenance program include:
District Asset Management PlanWells
- Depending on available funds, one or two well casings are cleaned each year.
- Well master meters are calibrated annually.
- Well motor control cabinets are inspected and examined by infrared for poor joints, weak fuses, bad insulation, etc.
Booster Pumps
- Booster pumps are lubricated twice a year.
Pressure Reducing Stations
- Pressure reducing stations are rebuilt every 4 years.
Disinfecting Equipment
- Disinfection agent feeding equipment is rebuilt twice a year.
Tanks
- Tanks are inspected annually.